This guide covers problems you may hit with learning plan components. For how components complete, see A How-To-Guide to Learning Plan activities. For how progress is worked out, see How learning plan and criteria progress are calculated. For how programme changes reach learners already enrolled, see Learning plan synchronisation.
Access
Why can't a learner open their learning plan?
What you'll see: the learner is sent to their onboarding when they log in, or sees an "All good. You're up to date" screen.
What to check:
- The learner has completed onboarding and signed all their compliance documents. If documents haven't been created for them, see Generating, updating and signing compliance documents.
- Today is on or after the programme start date.
Component status
Why is an Assignment (Task) still 'Not started' when the learner has submitted evidence?
Likely cause: an Assignment (Task) component's status follows its task. If the task hasn't been started, the component stays 'Not started', whatever evidence is uploaded. This happens when Don't create a task is ticked: no task is created automatically, but the component still needs one. You'll see this when evidence has been referred, or accepted on a component set to 'Tutor decides'.
What to do (in Aptem Classic):
- Select Create within the component.
- Create the task, choosing the type and due date.
- Select Start on the component. The status updates.
- Select Mark as Complete to complete the component.
Mapping and evidence
Why does mapping track progress for some learners but not others on the same programme?
Likely cause: the mapping isn't set up correctly in the learning plan template at programme level, so learners enrolled at different times have different mapping.
What to do:
- Correct the mapping in the programme's learning plan template.
- Correct it on the affected learners' learning plans, individually or with Learning plan synchronisation.
- Re-assess the evidence already submitted against the newly mapped criteria, so progress recalculates.
Why do Scheduled Online components show "Number of Evidence 0/1" when they don't require evidence?
Likely cause: the components were set to require evidence at programme level when the learners were enrolled. Aptem keeps the component set-up from enrolment, so editing the components later, at programme or learner level, doesn't change it.
What to do:
- Edit the programme.
- In the programme's learning plan token, copy the components and delete the originals.
- Set the copies to 'Tutor decides' and make sure Require evidence isn't ticked.
- Save the programme.
- In Aptem Classic, remove the learners from the programme, then apply them again. Using Aptem Classic avoids updating the learners' ILR unintentionally.
The components no longer show "Number of Evidence 0/1".
Reports and display
Why does text in an Asset Report PDF overlap or look unreadable?
Likely cause: the text was copied from a website, email or Word document and pasted straight into the asset. Hidden formatting conflicts with the PDF's fonts and layout.
What to do: paste copied text into a plain text editor such as Notepad first, then copy it again and paste it into the asset. If the evidence has already been submitted, refer it back so the learner can resubmit with the corrected text.
Why do learning plan filters stay after logging out?
Learning plan filters stay while you're logged in and clear when you log out. If they're still there after you log out and back in, it's a browser caching issue.
What to do: clear your browser cache.