October 2026 release notes

Act on concerns flagged by the virtual assistant

Available with Aptem Enhance.

Released 1 October 2026.

The people in your organisation responsible for handling concerns can now see, act on and keep a record of potential concerns that the virtual assistant flags in learner conversations, all from a new concern management area.


Get notified straight away

When the virtual assistant flags a potential concern, administrators with the concern management permission receive an in-app notification. If they aren't logged in, they also receive an email with a link to the flagged item. Notifications contain no learner personal details. To receive the emails, administrators need All emails switched on.


Review, decide and export

The concern management area lists every flagged message with a reference number in the format CM##### and the context around it. Record a decision of Action required or No action required for each item, and export records to CSV. Flagged items are deleted automatically after 90 days, so review and export anything you need to keep before then.


Keep a full audit trail

A history log, with Held by Aptem and Deleted views, records every decision, who made it, and each automatic deletion. The audit trail remains after the flagged content itself has been deleted, and the log stores no learner personal data. You need the data export permission to export it.


A clearer experience for learners

When a learner's message triggers moderation, it no longer disappears from the chat. Learners see "Your message has been received." in its place, and the virtual assistant's supportive follow-up appears as normal. (Released 30 September 2026.)


To get started, assign the concern management permission to the staff responsible for handling concerns in your organisation.


Create a checkpoint for multiple learners at once

Available with Aptem Enhance on the Enterprise package.

Released 15 October 2026.

Tutors and administrators with the Supervisor or Checkpoint Tutor role can now create a manual checkpoint for several learners at once, from the Checkpoint reporting area. Previously, you had to open each learner's details and repeat the same setup for each one.

A wizard takes you through four steps:

  1. Choose a programme. Select a delivery or onboarding programme. Only programmes whose standard has Checkpoint enabled are listed. For an onboarding programme, also choose the standard the checkpoint assesses against.
  2. Set up the checkpoint. Name it, choose the KSBs and set question targets for each KSB.
  3. Choose learners. Search by learner or employer name, and filter by Group and Programme status to find the cohort you need, then select anything from one learner to the whole cohort. Learners on a break or who have completed their programme are left out automatically.
  4. Review and confirm. Check the checkpoint details and selected learners. Nothing is created until you confirm.

See checkpoint results inside the review

Available with Aptem Enhance.

Released 22 September 2026.

Tutors can now see a learner's checkpoint results in the learning progress section of a review, without leaving the review to look them up. The checkpoint widget summarises the learner's completed checkpoints and is hidden if they have no checkpoint data.

The widget is also included in the review PDF generated when the review is completed and signed, so the signed record shows the learner's checkpoint results. Select See all Checkpoint results to open the learner's full checkpoint page in a new tab while keeping the review open.


Other updates and fixes

Continue a checkpoint later

Available with Aptem Enhance on the Enterprise package.

Released 27 October 2026.

Learners can now leave a manual checkpoint part way through and continue it later. Their answers are kept, and they pick up at the first unanswered question. A checkpoint in progress doesn't appear in the learner's checkpoint history until it's completed.

The progress bar now shows how many questions the learner has answered out of the total, as well as which question they're on. Skipping a question or going back to check an earlier answer doesn't move the bar, and the bar only shows as full when every question has been answered. Learners need to answer every question before they can complete the checkpoint.

Two values have changed to support this:

  • Date taken shows the date the learner completed the checkpoint.
  • Time spent counts only the time spent answering questions, added together across sittings. Breaks between sittings aren't counted, so a checkpoint started on Monday and finished on Friday won't show five days.

These values are the same in the checkpoint grids and report, the CSV export, the learner summary and the OData feed. You can also filter and sort on time spent in the OData feed. If your own reports work out time spent from the start and end dates, we recommend you use the time spent value instead.

When this change is switched on:

  • Checkpoints already completed don't change. Their score, answers and date taken stay the same.
  • Checkpoints that were started but not completed open from the first question. Answers weren't saved part way through before this change, so there's nothing to carry over.
  • Checkpoints not yet started are taken with the new behaviour, so learners can continue them later.

Activity log

Available with Aptem Essentials and above.

See your hours progress on each learning plan component

Released 28 October 2026.

Learners can now see how many hours are planned for a learning plan component, and how much of that time has been accepted or is awaiting review. This helps them see how much time is left before they log more.

  • On the learning plan, each component with planned hours shows its planned, accepted and pending hours in the component details, above the Log activity button.
  • On the Log activity form, when a learner selects a component, Remaining hours appears under Time spent. It updates as they enter the time spent, and Show breakdown shows how the figure was worked out.

Planned hours are the component's planned hours plus its planned English and maths hours, the same total a tutor sees when reviewing an activity on that component. Draft and rejected activities don't count towards accepted or pending hours, and no figure goes below zero. Components with no planned hours don't show any hours information.


Complete a component when its planned hours are met

Released 28 October 2026.

Tutors can now be asked whether to mark a learning plan component as complete as soon as an accepted activity brings it up to its planned hours, including any planned English and maths hours. This helps keep the learning plan up to date without tutors having to check each component by hand.

A system administrator needs to turn on the new option to offer component completion when planned hours are met. It's in the activity log settings and it's off by default. Once it's on:

  • When a tutor accepts an activity that meets the planned hours, a message asks "Planned hours for [component name] are met. Mark it as complete?" The tutor selects Yes or No.
  • Selecting Yes completes the component in the same way as selecting Complete on the learning plan, and the component history shows who completed it.
  • Selecting No leaves the component as it is. The message appears again the next time the tutor accepts an activity while the planned hours are still met.

The message only appears for learners on programmes that use the activity log, and only for components set to Tutor decides. The tutor needs permission to complete the component, and any evidence the component needs must already be in place. No notification or email is sent, and a completed component isn't reopened if the accepted hours later go down.


Generate an Hours log compliance document

Released 15 October 2026.

You can now generate an Hours log compliance document for any learner on an apprenticeship programme. It gives you a signed, audit-ready record of the learner's verified hours, taken from their activity log. Generate it from the Signatures grid in Console. It's available for every apprenticeship programme, with no set-up needed in the programme builder.

The document includes:

  • the learner, programme, provider and employer details, with the programme and ILR start and end dates
  • an hours summary showing planned and verified off-the-job training hours, plus English and maths and other hours where the learner has them
  • a table of activities split into off-the-job training, English and maths, and other, grouped by learning plan component, with a subtotal for each section
  • signature blocks for the learner, tutor and employer, using the standard Aptem signature workflow

Only accepted activities are included, so check that the learner's activities have been reviewed before you generate the document. Each time you generate it, a new timestamped PDF is saved to the learner's compliance documents. Earlier versions are kept and don't change.


Attach a supporting file

Released 15 October 2026.

Learners can now attach a single file of up to 10MB to an activity log entry, such as a photo or document that supports what they've recorded. Administrators control whether file uploads are available in the activity log configuration. Video and email files are not supported.

File uploads are for light supporting material only. They don't replace portfolio evidence, which should still be added to the learning plan. We recommend you brief your tutors and learners on this.


Uploaded files are scanned for malware

Released 15 October 2026.

Every file uploaded to the activity log is scanned for malware automatically. Only files confirmed as clean can be downloaded. A file that is still being scanned, or that fails the scan, can't be downloaded until it is cleared or removed.


Require a file with every activity

Released 28 October 2026.

Administrators can now require learners to attach a file when they log an activity. This suits programmes where the evidence is a document, such as a continuing professional development (CPD) log.

In the Documents section of the activity log settings, turn on Show a file uploader so learners can attach documents, then turn on Mark this field as required. It's off by default, so nothing changes until you turn it on. If you turn the file uploader off, the required setting keeps its value and comes back when you turn the uploader on again.

When a file is required:

  • The upload field on the Log activity form is marked as required, and Log activity stays unavailable until the learner attaches a file.
  • If the learner removes a file they've added, the message "A file is needed to log this activity." appears.
  • A file is needed every time an activity is saved. That includes new activities, edits, drafts being submitted and resubmissions, including a rejected activity that was first submitted without a file.
  • A file that has been blocked by the malware scan doesn't count as an attached file.

The existing file rules still apply: one file per activity, up to 10MB, and no video files. Activities submitted before you turn the setting on aren't affected. Staff can still see the attached file under Documents, where they can download it. The setting applies to all programmes.


See which entries include a file

Released 28 October 2026.

The activity log OData feed and CSV export now include an Includes File column, showing whether an entry has a clean, scanned file attached. The CSV export also has a new Activity Source column showing where each entry came from, such as the activity log, SCORM, a placement, evidence or a Teams meeting. If you use these exports in your own reports, you may want to add the new columns.


Own-time hours can no longer be logged as off-the-job training

Released 28 October 2026.

Off-the-job hours stay accurate because learners can no longer log time spent in their own time, without pay or time off in lieu, as off-the-job training or English and maths.

A message under When did this take place? explains that this time doesn't count towards off-the-job hours. Log activity stays unavailable until the learner changes the type of activity to Other. The same applies when a learner edits an entry, including older entries already saved with this combination.

Learners need Other to record this time, so the activity log form settings now require Other to be selected under Activity types whenever the option for own time without pay or time off in lieu is on. The settings won't save without it. If Other was hidden alongside that option, we've turned it on. To stop learners using Other, turn off the own time option instead.


Activity log migration complete

Released 23 September 2026.

The move of evidence and off-the-job training hours into the activity log is complete, and learner dashboard totals for submitted, completed and forecast hours are accurate and up to date as activities are added, changed or deleted.

Whenever evidence is saved, the matching activity log entry is created at the same time, so the two always stay in step.


ILR reference data updates

Available with Aptem Essentials and above.

Learning delivery monitoring (LDM) and delivery access method (DAM) reference data has been updated in line with the 2026/27 ILR specification:

  • LDM code 397 is now valid until 28 February 2028. (Released 18 September 2026.)
  • New LDM code 405 (higher education module or modular pathway) is available for learning deliveries starting on or after 1 August 2026. (Released 18 September 2026.)
  • Validity dates are extended for 19 existing DAM codes, and new DAM codes 115 to 119 are available: flexible delivery, tutor-led distance learning, ESOL programme, engineering project, and regional work academies. (Released 18 September 2026.)
  • New DAM code 120 (WMCA flexibility) is available for learning deliveries funded through West Midlands Combined Authority flexible provision, valid from 1 August 2026 to 31 July 2030. (Released 18 September 2026.)
  • DAM code 112 (further education cold spots) is now valid until 31 July 2027. (Released 23 September 2026.)
  • New DAM code 121 (getting job ready with AI, DWP pilot) is available for learners on this DWP pilot programme, valid from 1 August 2026 to 31 July 2028. (Released 5 October 2026.)
  • New DAM code 122 (Cornwall professional tickets) is available for learning deliveries funded in part through Cornwall professional tickets, valid from 1 August 2026 to 31 July 2028. (Released 23 October 2026.)

Existing learning delivery records are unaffected.


Two more apprenticeship standards added

Available with Aptem Essentials and above.

Released 28 October 2026.

FA0010 (rail foundation apprenticeship) and ST1483 version 2.0 (production manager) are now in Aptem's apprenticeship standards data. Programmes and training plans for learners on either standard now show the correct published minimum off-the-job training hours. Existing apprenticeship records are unaffected.


See why learners are missing from QAR

Available with Aptem Essentials and above.

Released 12 October 2026.

In the quality dashboard, you can now see learner aims that are excluded from QAR in the Learner aims table on the QAR Headline page. Set the Included in QAR? filter to No to see them. Each excluded aim is listed under the hybrid end year it would have counted in, and the exclusion columns show why it was excluded. The Excluded From batch column is now called Excluded aim from batch.

The help text on the QAR Headline and QAR Functional Skills pages has been updated to match. QAR, retention and pass rate figures are unchanged, and so is the default view of the page.


The funding dashboard UKPRN filter lists only your learners' UKPRNs

Available with Aptem Essentials and above.

Released 23 October 2026.

When you filter the funding dashboard by UKPRN, the filter now lists only the UKPRNs used by learners in the groups you can access. Previously, it could also list UKPRNs used only by learners in other groups, and selecting one of those showed no data. Figures on the funding and quality dashboards are unchanged.

If a UKPRN you expect is no longer listed, none of the learners you can access have aims under it.


Fixes

Pass Functional Skills results credited for subjects not yet started (Released 9 October 2026.)

Available as part of the relevant integration add-on.

If a learner completed a Pass Functional Skills assessment before starting that subject in Aptem, the result didn't come through and they couldn't move on in the Onboarding Wizard. Starting either English or maths in Aptem now sets the learner up for both subjects and credits any results they've already completed in Pass. Results Pass sends for a subject the learner hasn't started yet are now recorded too.


Supervisors can see archived learners in Aptem Dashboards (Released 15 October 2026.)

Administrators with the Supervisor permission can now see archived learners in the caseload, compliance, Employ, funding and quality dashboards, as they can elsewhere in Aptem. This also fixes archived learners not appearing in the QAR Headline report. Where an archived learner's ILR is still in the batch, their aims count toward QAR and funding figures. Where it has been excluded from the batch, the learner shows as excluded rather than missing.

Administrators without the Supervisor permission won't see any change. Archived learners stay hidden from them, and their figures, including QAR, exclude them, so two administrators may see different figures for the same group. Each dashboard also now applies an administrator's group access consistently on every page.

If you have the Supervisor permission, you may notice the following:

  • Some pages include archived learners by default, such as the QAR pages and the funding and compliance dashboards. Others leave them out until you select Archived in the Subscription status filter. These include the caseload pages and the Ofsted Headline page in the quality dashboard.
  • On the caseload occupancy report, the number of expired or cancelled accounts with valid open aims may go up, because archived learners are now counted.

If you don't see the change straight away, refresh the dashboard.


epaPRO (Proficient) integration credentials kept hidden (Released 14 October 2026.)

Available as part of the epaPRO (Proficient) integration add-on.

Once you save the epaPRO (Proficient) client secret and account password, Aptem no longer shows them again or sends them to your browser. Both fields show dots, with no option to reveal the values. To change a credential, enter the new value and select Save. If you save without changing anything, your stored values stay as they are. If you change the API endpoint to a different server, enter the client secret and password again. If you need the values again, get the client secret from your EPAO and the password from whoever manages your epaPRO (Proficient) account.


Aptem community opens on mobile devices (Released 14 October 2026.)

On mobile devices, the Aptem community icon didn't respond when you tapped it. It now sits in the top-right corner of the screen on mobile. On desktop, Aptem community stays where it was.


Activity log shows data for the right programme (Released 14 October 2026.)

The activity log now shows only activities, components and off-the-job training hours from programmes linked to the activity log. On the tutor dashboard and in the review wizard, activity counts, accepted hours and last logged dates now cover only the learner's current programme. If a learner is on more than one programme, check that each programme you expect is linked to the activity log.


Planned off-the-job training hours created for 2026/27 CSV enrolments (Released 14 October 2026.)

When you enrol learners onto 2026/27 FM36 programmes using bulk CSV upload, Aptem now creates their planned off-the-job training hours record from their planned hours. Previously, ILR batch files for these learners failed validation.


Compliance dashboard shows documents for the learner's own programmes (Released 21 October 2026.)

On the Compliance Documents page of the compliance dashboard, each learner now shows only the documents for the programmes they're enrolled on. Previously, a learner could be listed against document requirements from every programme in your organisation, including programmes they weren't on. If you checked compliance documents on this page, or exported lists from it, since 12 October 2026, we recommend you check them again.


Bulk CSV import no longer creates duplicate learners (Released 28 October 2026.)

When you bulk upload learners using a CSV file, re-submitting or re-uploading the file no longer creates duplicate learner records. If an import is already in progress or doesn't complete, you now see a clear message. If an import request times out, check the Users list before you try again.


ILR export includes aims in the year between end and achievement (Released 28 October 2026.)

This fix affects a small number of apprenticeships where the learning actual end date is on or before 31 July 2025 and the achievement date is on or after 1 August 2026. Once the achievement date was recorded, the ILR export left the programme aim and its component aims out of the 2025/26 batch. They were still included in the 2026/27 batch. The 2025/26 batch now includes them.

No other records are affected. Aims achieved in the same collection year as the learning actual end date, or in the year straight after it, are exported as before, and so are aims still waiting for an outcome (Outcome 8). If you set Force Include in Batch to 25/26 on any of these aims as a workaround, you can leave it in place. Each aim still appears only once in the batch.

The same fix applies to the 2026/27 batch, so aims that end in 2025/26 and are achieved on or after 1 August 2027 will stay in your 2026/27 return.


Marking aid evidence stays marked after saving (Released 19 October 2026.)

Available with Aptem Enhance on the Enterprise package.

When a tutor or administrator marks a component that uses a marking aid exercise, the evidence now stays marked after they save their feedback. Previously, marked evidence could go back to Requires marking a few seconds after it was saved, so it had to be marked again.


Notes load and save reliably (Released 29 October 2026.)

Notes on a learner's profile now load and save reliably for organisations with large numbers of users and contacts. Previously, adding a note could fail with an error or take several attempts.


Learners can now enter an activity duration up to the daily hours limit your organisation has set. Previously, the duration field stopped at 23 hours even where a higher limit was configured. (Released 30 September 2026.)


Administrators can now enable activity log for any programme in Settings, including programmes that previously appeared greyed out and couldn't be selected. (Released 28 September 2026.)


Marking aid evidence now opens correctly for assessors from anywhere in Aptem, such as the Requires marking card on the performance dashboard or a Message Centre notification. After marking, the component no longer stays showing as Requires marking. (Released 28 September 2026.)


Upcoming

Here's what we're working on for upcoming releases:

Prepare for reviews with Briefing

Will be available with Aptem Enhance on the Enterprise package.

Tutors will be able to generate a briefing from the review screen, so they start each review already up to speed. The briefing will summarise the learner's recent activity log entries and learning plan progress, and administrators will be able to switch it on or off in Tenant settings. We'll add further data sources to Briefing over time.


A simpler way to bring learner data into Aptem

We're building a self-service data import tool for ILR data, designed to reduce the manual back and forth involved in fixing data issues during import. A first customer trial of this tool is expected soon.


Was this article helpful?
0 out of 0 found this helpful