Interpret the Aptem Classic 'Off-The-Job Hours' report

In Aptem Classic, when viewing a learning plan, an off-the-job hours report is shown. An example is displayed below.

Off-the-job hours report showing Target, Minimum required, Planned, Completed, and Forecast hours fields

The fields in this report are described below.

Target

The minimum required OTJ hours calculated up to the current date. Displays as "0 h" if not populated.

Minimum required

The minimum required OTJ hours for the entire apprenticeship. Displays as "0 h" if not populated.

Planned

The planned hours recorded in the main aim of the ILR at enrolment, covering the entire apprenticeship. Displays as "0 h" if not populated.

Completed

The total completed OTJ hours for the entire apprenticeship. Calculated by summing the off-the-job time logged against evidence with a status of Accepted or Verified, where the related component status is Completed or Verified. Evidence with a status of Referred is excluded. Evidence relating to components with no due date set is included. Displays as "0 h" if not populated.

Forecast hours

The total of completed OTJ hours plus planned hours for all non-completed components across the entire apprenticeship. Displays as "0 h" if not populated.

Note: for the equivalent report in the Aptem console, see Interpret the Aptem Console off-the-job hours report.

Was this article helpful?
0 out of 0 found this helpful