- Expected Start Date in EPAPro = Practical Period Start Date in Aptem
- Expected Gateway Date in EPAPro = Practical Period End Date in Aptem
(Updates to the Expected Gateway Date must meet the minimum duration for the standard and cannot be set in the past.)
- Expected Completion Date in EPAPro = Apprenticeship End Date in Aptem
(This is calculated as the ILR-based Planned End Date in Aptem plus the Length of the EPA Period configured for the programme.)
- Where can I see these dates?
- In Aptem: The corresponding dates are found in the Programme Details section.
- In EPAPro: These dates appear in the "View Apprentice" > "Apprenticeship Details" tab.