Here are the rules for the figures to show in red on the Off the Job Hours card:
- Minimum Required: Where the minimum required figure is higher than the forecast figure, this is displayed in red.
- Planned (ILR): Where the planned figure is higher than the forecast figure, this is displayed in red.
- Forecast: Where the forecast figure is below either the minimum required or planned, this is displayed in red.